ACI 302.1 R PDF

ACI R: Guide to Concrete Floor and Slab Construction. R —Classification of floors. ACI R Guide for Concrete Floor and Slab. Construction. Reported by ACI Committee Carl Bimel. Chairman. Here’s what’s important in the new ACI Guide to Floor and Slab Construction. ACI R and ACI R are a complementary set. A new edition of ACI .

Author: Kajizilkree Fenrigrel
Country: Cayman Islands
Language: English (Spanish)
Genre: History
Published (Last): 2 January 2009
Pages: 290
PDF File Size: 16.47 Mb
ePub File Size: 15.1 Mb
ISBN: 920-7-62522-997-7
Downloads: 98170
Price: Free* [*Free Regsitration Required]
Uploader: Samukinos

Smith cKinney Bruce A. Properties of the surface are determined by the mixture proportions and the quality of the concreting and jointing opera- tions. Finishing lightweight concrete — Section All installations come with a complete single source warranty. Classes 3, 7, and 8 2. From testing to consultation and complete installation services, Surface Solutions is your premiere source of non-toxic, safe and environmentally friendly flooring systems, offering turnkey installations using only in-house personnel.

Failure to address this issue can contribute to undesirable characteristics in the wearing surface such as cracking, low resistance to wear, dusting, scaling, high or low spots, poor drainage, and increasing the potential for curling.

R-1 This guide describes how to produce high-quality concrete slabs-on- ground and suspended floors for various classes of service.

Patton Gulyas William S. Our home office at W. The American Concrete Institute disclaims any and all responsibility for the stated principles.

Adequate supervision and inspection are required for job operations, particularly those of finishing. Design considerations — Chapter 5 Section 5.

ACI 302.1R-15: Guide for Concrete Floor and Slab Construction

Niemitalo Fricks Mark E. This document is intended for the use of individuals who are competent to evaluate the significance and limitations of its content and recommendations and who will accept responsibility for the application of the material it contains.

  HAYTER HARRIER 41 MANUAL PDF

Reference to this document shall not be made in contract documents. Ault Edward Charles M. The user must determine the applicability of all regulatory limitations before applying the document and must comply with all applicable laws and regulations, including but not limited to, United States Occupational Safety and Health Administration OSHA health and aaci standards.

Refer to 032.1 latest edition of ACI R for a detailed discussion of shrinkage and curling in slabs-on-ground. Rohrer olland Philip A.

Phelan arrison Dennis W. Subgrade tolerance — Now, Section 6. Committee Felder John P. Refer to the latest edition of ACI R for a detailed discussion of cracking in reinforced and nonreinforced concrete slabs. We can create a free custom quote for your next project within 24 hours. Not to mention, understanding the role of the soil-support system, job site chemistry; mixing the right proportions of concrete ingredients and using expert finishing techniques for a concrete floor to perform as expected during different stages of its life.

ACI does not make any representations with regard to health and safety issues and the use of this document.

ACI R Guide for Concrete Floor and Slab Construction

Concrete floor slabs employing portland cement, regardless of slump, will start to experience a reduction in volume as soon as they are placed.

This phenomenon will continue as long as any water, heat, or both, is being released to the surroundings. View a Showcase of Our Work. We have two locations to serve you: It emphasizes aspects of construction such as site preparation, concreting materials, concrete mixture proportions, concreting workmanship, joint construction, load transfer across joints, form stripping procedures, finishing methods, and curing.

  JBL 2453 PDF

Elements of Engineering a Damn Good Industrial Floor (Part 1)

Get a Quote Did we mention it’s free? Callas Robert J Douglas W.

If this list is not provided, the contractor should request it from the designer. In the first update sincethe new ACI Placing operations — Whereas checkerboard placement remains unacceptable and placing concrete in strips is an acceptable way to place concrete for large areas, large block placements using a laser screed is now the recommended —and preferred- method.

One of the most comprehensive resources available for designers, contractors and facility owners that can help them avoid potential debacles during concrete floor construction is the American Concrete Institute ACI Guide to Floor and Slab Construction. Classes 1, 2, 4, 5, and 6 2. Armitage Ave Suite 1 in Chicago ; Phone: For all of its strength and durability, concrete slab construction is a delicate thing.

All rights reserved including rights of reproduction and use in any form or by any means, including the making of copies by any photo process, or by electronic or mechanical device, printed, written, or oral, or recording for sound or visual reproduction or for use in any knowledge or retrieval system or device, unless permission in writing is obtained from the copyright proprietors.

Notable Updates to ACI Neudeck oreman Scott E.